Concrete is mixed in a lorry and poured on site. A cube test catches a bad batch.

The idea

Concrete is ordered by strength class, e.g. C30/37: 30 MPa on cylinders, 37 MPa on 150 mm cubes, as a 5% characteristic value. Every batch is checked by crushing cubes at 28 days.

EN 206 (first results, groups of 3): the mean must be at least $f_{ck} + 4$ MPa and every single result at least $f_{ck} - 4$ MPa.

Crush the three cubes (โ–ถ). The machine reports the failure load F; strength is $f = F / A$ with $A = 150 \times 150$ mmยฒ.

By the end you can

  • Concrete is ordered by strength class, e.g. C30/37.
  • Cube strength = failure load รท 22,500 mmยฒ.
  • Conformity: mean โ‰ฅ class + 4 MPa and every cube โ‰ฅ class โˆ’ 4 MPa.