Anyone can look around, but taking a lesson needs a free account. With one, your answers are checked step by step and your progress is saved, so you can stop and pick up where you left off on any device.
A building has emitted much of its carbon before anyone switches on a light.
Making cement and steel releases a lot of CO₂: about 340 kg for every m³ of ordinary concrete and 2 kg for every kg of reinforcing bar made from iron ore. This embodied carbon is emitted before the building is used.
Engineers count it per m² of floor (kgCO₂e/m²) and rate structures on the IStructE SCORS scale, from A++ to G.
Levers: less material (thinner slabs, lighter frames), and lower-carbon material (cement replaced with GGBS slag, steel from scrap).
Discussion 0 comments
Log in to join the discussion.