Spreading the load
A road is a stack of layers, each spreading the load for the one below. A tyre presses on the road at 700 kPa; the soil underneath can take only a few tens of kPa without rutting. Each layerโฆ
312 posts match
A road is a stack of layers, each spreading the load for the one below. A tyre presses on the road at 700 kPa; the soil underneath can take only a few tens of kPa without rutting. Each layerโฆ
A small change to one connection killed 114 people. Find out why in five minutes of statics. Kansas City, 17 July 1981. Two walkways hung one above the other across the hotel atrium, the upper onโฆ
A bridge collapsed because nobody recalculated its own weight. On 29 August 1907 the south half of the Quebec Bridge, being built out as a cantilever over the St Lawrence, collapsed in seconds. 75โฆ
A grain elevator tipped over in one piece in a day. The soil had not had time to drain. Near Winnipeg, October 1913. A new concrete grain elevator, a long block of bins on a single raft, was beingโฆ
The world's most famous mistake was saved by a war. Work began in 1173. By the third storey the tower was already leaning: it stands on soft, compressible clay that is slightly softer on its southโฆ
Small changes, each one cheap, added up to the deadliest collapse in South Korea's history. Seoul, 29 June 1995. In about twenty seconds the five-storey flat-slab building collapsed. 502 people died.
Every kilogram on every floor ends up in the ground. Follow it down. Every kilonewton on a floor finds its way to the ground. In a flat-slab building each column carries the floor area halfway toโฆ
Every part of a building depends on every other part. Change one and the rest notice. Everything is connected. A thicker slab spans further but weighs more, and every column and footing carriesโฆ
Every building sways at its own rhythm. Shake it at that rhythm and it can tear itself apart. Push a building sideways and let go: it sways back and forth at its own natural period T, set by itsโฆ
Tall, slim buildings have to resist the wind like a tree does. Wind pressure grows with height and with exposure. Eurocode gives the peak pressure $q_p(z)$ from the basic wind speed $v_b$ and theโฆ
In earthquakes, buildings rarely fail evenly. They fail at their weakest storey. An earthquake moves the ground; the floors' inertia resists: $F = m\,a$. The design spectrum $S_d(T)$ says whatโฆ
The cleverest earthquake protection lets the ground move underneath the building. Hospitals and emergency centres must work straight after an earthquake: no damage, and floors calm enough thatโฆ
Building a road is mostly moving soil. The art is to move as little as possible. A road over hilly ground is cut through the high ground and built up on embankments over the low ground. Diggingโฆ
A building's finish date hides in one chain of activities. Find it and you control the project. A construction programme is a network: foundations before the frame, the frame before the claddingโฆ
Landslides almost always follow heavy rain. This lesson shows why. A slope stands while the soil's shear strength along any slip surface exceeds the pull of gravity. The ratio is the factor ofโฆ
Cities flood when rain has nowhere to soak in. This lesson measures how much more runs off. Rain soaks into soil until the soil is full; the rest runs off. Paving stops the soaking. The SCS curveโฆ
New estates have ponds for a reason: they slow the rain down. A detention basin stores the storm's peak and lets it out slowly through a small orifice: $Q = C_d \, a \sqrt{2 g h}$. The same waterโฆ
Every bend on a road is sized for a speed. Too tight, and cars slide off. A car in a bend needs a sideways force to turn: friction between tyres and road, helped by tilting the road (superelevation โฆ
Traffic lights share time. Share it well and queues melt away. A signal lane can discharge about $s = 1800$ veh/h of green. Over a cycle C with effective green g its capacity is $c = s \cdot g / C$โฆ
Every number in a design comes from a test. Here you run one. Design values come from tests. A tensile test pulls a bar until it breaks while the machine records force F and extension ?L. Engineersโฆ
Concrete is mixed in a lorry and poured on site. A cube test catches a bad batch. Concrete is ordered by strength class, e.g. C30/37: 30 MPa on cylinders, 37 MPa on 150 mm cubes, as a 5%โฆ
How grippy is soil? You find out by breaking some. The slope and foundation labs need the friction angle ?' and cohesion c'. They come from tests like the shear box: a soil sample is pressed downโฆ
The ground is the one material you can't order. You have to go and find out. Under every building is ground nobody has seen. A site investigation buys knowledge: a borehole (โฌ2,000) shows theโฆ
Concrete is cheap stone, steel is strong wire. Together they build most of the world. Concrete is strong in compression ($f_{ck}$ = 30 MPa for C30/37) but weak in tension ($f_{ctm}$ ? 2.9 MPa). Aโฆ